Sunward integrated inclined-shaft equipment
Meet Sunward Machine at bauma CHINA 2026 in Shanghai
November 6, 2026

Sunward Rolls Out Maria TBM for Minsk Metro in Belarus

The Maria tunnel boring machine rolled out of Sunward Machine’s Guangdong manufacturing base on January 20, 2026. Built for the Minsk Metro project in Belarus, it will be used in the city’s metro construction.

Guests at the Maria TBM rollout ceremony in Guangdong.
Guests at the Maria TBM rollout ceremony in Guangdong.

Designed for Minsk’s ground conditions

Sunward’s engineers developed the machine around the ground conditions of the Minsk project. The design incorporates intelligent excavation systems, precise control and energy-saving features.

Excavation diameter: 6,280 mm
Minimum turning radius: 300 m
Maximum longitudinal gradient: 40‰ (4%)

The machine has a high-strength, wear-resistant cutterhead designed for ground where water and sand inflows pose a risk. Controlling surface settlement is another design requirement, alongside construction safety and quality.

Cooperation on metro construction

A representative of the Minsk metro construction company said confidence in Chinese engineering, product design and economic value had informed the choice of partner. The cooperation covers construction experience, technical standards and service support as well as the machine itself.

Sunward plans to build on the project through further cooperation in high-end manufacturing between China and Belarus. It will continue supplying equipment and technical services to international partners working on underground infrastructure.

Discuss your metro tunnelling project

Contact Sunward’s technical team with your tunnel alignment, ground conditions and construction requirements to discuss a suitable TBM configuration.

CONTACT SUNWARD TBM

Sunward Rolls Out Maria TBM for Minsk Metro in Belarus
This website uses cookies to improve your experience. By using this website you agree to our Data Protection Policy.
Read more
WWhatsApp